Onshore infrastructure and equipment

Features: 
  • Subsea cable landing point.
  • Substation equipped with 2 20 MW 13.2/132 kV of 25 MWA transformers with protection and control panels.
  • Electrical installation: from the landing point to the substation (4 x 13.2kV / 5MW), and from there to the power grid (1 x 132kV/20MW).
  • Monitoring and control system.
  • Research and Data Centre.
    Offices for WEC manufacturers with equipment under test, and for personnel of the Centre.
    Data monitoring system